SRISTI (Sustainable Rooftop Implementation for Solar Transfiguration of India): Concept Note

Policies
Typography

This document presents a brief concept to integrate DisComs as an implementing agency
in Phase-II of rooftop solar scheme of MNRE. The document also provides an insight of
the various factors that attribute to bring DisComs to the fore- front, instead from being an
indirect participant, for rooftop solar (RTS) implementation in the country. The concept,
once approved, shall serve as the basis of revised scheme of MNRE for solar rooftop in
Phase-II and will replace the CCEA note that has been submitted to cabinet since
18.04.2017. This concept only provides an idea for implementation and shall be circulated
to all stakeholders for comments on the same. The Phase-II targets and arrangements shall
be applicable till 2021-22. The proposed scheme shall thrive to ensure that the national
target of solar rooftop of 40 GW is achieved within time.
1. Background:
Rooftop solar (RTS) plants utilize idle rooftop space for solar generation. Typically 1 kWp
RTS plant requires about 10 sq. m area. Such power can then be used, either for captive
consumption of the premises or can be fed into the grid and be adjusted in the electricity
bill. Net metering regulations notified by respective State Electricity Regulatory
Commissions (SERCs) provide a legal framework for such adjustment. RTS plants also
help Distribution utilities/companies (DisComs) by eliminating transmission and
distribution losses as power consumption and generation are co-located. These are also
useful in tackling day time peak loads as solar generation profile matches such peak loads.
Government of India has set the target of installing 40,000 MWp of RTS power by the
year 2022.

 

Advertisement

Translator

Advertisement
Advertisement

SolarQuarter Tweets

Follow Us For Latest Tweets

SolarQuarter Announcing: Participating Companies At India's Largest Electric Vehicle & Smart Mobility Event_ Grab Your Passes No… https://t.co/5bvIrR19N1
About 20 hours ago
SolarQuarter Meet 2018 Award Winners: Solar PV ModuleTECH Awards 2018_Heartiest Congratulations! - https://t.co/4cBviyv7wb
Thursday, 16 August 2018 12:52
SolarQuarter EMobility Week India 2018 Only 36 Seats Remain! Secure Your Spot! 23 Aug 2018_New Delhi - https://t.co/mmAuUGkxCd
Saturday, 11 August 2018 08:23

Advertisement