India mulling Generation Based Incentive for 5 GW of future solar tenders

India
Typography

India is working on some new rules for 5 GW of solar projects to be tendered over three years, including bidding for a Generation Based Incentive (GBI).

Local consultancy Bridge to India said the renewable energy ministry (MNRE) is finalising the guidelines, with an announcement expected over the next two months. The timing of tenders and the geographical spread will depend on the needs of Indian power utilities

NTPC Ltd will be the off-taker for the 5 GW. It is expected to set the solar power purchase rate at INR 4.5 per kWh and urge developers to bid for additional compensation per kWh of produced power via the GBI model.

 

Translator

Advertisement

SolarQuarter Tweets

Follow Us For Latest Tweets

SolarQuarter Join the Journey of Pan India B2C Solar Rooftop Series in Your Cities; visit https://t.co/Ab6kpz9SRT for more deta… https://t.co/Y4oCRboELh
Monday, 14 August 2017 10:24
SolarQuarter SolarRoofs India wishes you a very Happy Independence Day!!! https://t.co/s28rPfG4ui
Monday, 14 August 2017 10:23
SolarQuarter SolarQuarter In Convestion with, >> Mr. KishorShinde, General Manager, Maharashtra Energy Development Agency >> Mr…https://t.co/o5Jcr8j3oB
Monday, 14 August 2017 09:13
SolarQuarter In conversation with Mr.Chris Prengels, CEO,Tiger Power https://t.co/8BqIT9VNh0
Friday, 11 August 2017 09:20
SolarQuarter BePresent With Biggest CXOs of Indian Renewable Energy Sector For DelegateRegistrations, contact: Ms. Pratika Jath…https://t.co/w44NCJOaUu
Tuesday, 08 August 2017 09:41

Advertisement
Advertisement