NVVN wins international bid for supply of 300 MW power to Bangladesh

India
Typography
NVVN wins international bid for supply of 300 MW power to Bangladesh

13th Feb, 2018

Bangladesh Power Development Board (BPDB) invited tender for supply of 500MW power from India under short term (1st June 2018 to 31st December 2019) and long term (1st January 2020 to 31st May 2033). The bid for this tender was submitted on 11th January 2018 and four bidders namely NVVN, Adani, PTC and Sembcorp submitted their bid. Financial bid was opened on 11th February 2018.

NTPC Vidyut Vyapar Nigam Limited (NVVN), wholly owned subsidiary of NTPC Limited emerged as successful bidder (L1) both in short term and long term for 300MW power.

The supply of power is likely to be commenced from June 2018 after commissioning of 500 MW HVDC inter connection between India and Bangladesh.


« Back to Press Releases
Advertisement

Advertisement

SolarQuarter Tweets

Follow Us For Latest Tweets

SolarQuarter Launching Asia Solar Power100 Map, Asia’s 100 Most Powerful Solar Leaders - https://t.co/9TAfDnV1nJ
About an hour ago
Saturday, 24 February 2018 06:57
SolarQuarter SolarQuarter_In Conversation with Mr. @Gaurav Sood, CEO, SPRNG Energy Pvt Ltd https://t.co/V8UcAfUu8q https://t.co/2hV7mQOdia
Friday, 23 February 2018 10:13

Advertisement

Translator

Advertisement