A bid has been issued for the development of a 450 kWp rooftop solar project at NTPC TLCMP. The bid was released on May 9, 2025, by NTPC Limitedโs SSC Coal Mining division, which operates under the Ministry of Power. The project is focused on a custom EPC (Engineering, Procurement, and Construction) contract, specifically for services related to the design, supply, installation, commissioning, and maintenance of a grid-connected rooftop solar power plant.
The contract duration is set for 2 years, 9 months, and 15 days. The closing date for bids is May 30, 2025, at 3:00 PM, with the bid opening scheduled for the same day at 3:30 PM. Bidders are expected to submit a lump sum price, which should include GST, along with a breakdown of the price bid. The total value of the bid will be evaluated to determine the winner.
An Earnest Money Deposit (EMD) of โน200,000 is required for participation, with a Performance Bank Guarantee (PBG) set at 5% of the contract value. The duration of the ePBG is 48 months. ICICI Bank has been designated as the advisory bank for both the EMD and PBG processes.
For the evaluation of bids, preference will be given to Micro and Small Enterprises (MSEs) as per the Public Procurement Policy for Micro and Small Enterprises (MSEs) Order, 2012. Interested bidders must submit their offers no later than the closing date and are expected to honor a bid validity period of 120 days after the bid closing.
Discover more from SolarQuarter
Subscribe to get the latest posts sent to your email.