Tender Document for setting up of 5 MW Grid connected Solar PV Power Plant at V.O. Chidambaranar Port Trust

Solar Tenders
Typography
Start Date : 27/04/2018

                     End Date : 11/06/2018

Tender Document for Setting up of 5 MW Grid connected Solar Power PV Pla.pdfnt at V.O Chidambaranar Port Trust Tender documents (Tender No. SECI/C&P/NIT/2018/VOCPT5 dated 27.04.2018) for Setting up of 5 MW Grid connected solar PV power Plant at V.O Chidambaranar Port Trust have been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser).Tender Document for Setting up of 5 MW Grid connected Solar Power PV Pla.pdfnt at V.O Chidambaranar Port Trust Tender documents (Tender No. SECI/C&P/NIT/2018/VOCPT5 dated 27.04.2018) for Setting up of 5 MW Grid connected solar PV power Plant at V.O Chidambaranar Port Trust have been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser).

Interested bidders have to download the official copy of Tender documents after logging into the TCIL website by using the Login ID and Password provided by TCIL during registration. The bidder shall only be eligible to submit/ upload the Response to Tender after logging into the TCIL portal and downloading the official copy. Bidders are requested to follow the instructions mentioned in the attached ETS guide to change the settings on Internet Explorer browser. Tender Search Code (TSC) for the Tender: SECI-2018-TN000015


Tender document : /web-data/docs/Tender%20Document%20pdf1.pdf

Technical Tender Document : /web-data/docs/Tender_document_Technical_2.pdf

Financial bid format (SOR) : /web-data/docs/Section-VIII_Format%20for%20SOR%20VOCPT.xlsx

Advertisement

Translator

Advertisement
Advertisement

SolarQuarter Tweets

Follow Us For Latest Tweets

SolarQuarter Announcing India's First Ever Energy Storage + Rooftop Solar Business Forum Only @ IRSC 2019_ 16-17 January 2019 at… https://t.co/54Mt5NJYcP
Monday, 10 December 2018 10:50
Monday, 10 December 2018 10:29
SolarQuarter Last Few Seats Left for South India's Most Powerful Event_Solar Power Developers Night on 11th Nov 2018_Bengaluru_R… https://t.co/dyqXBYMYXO
Friday, 07 December 2018 14:40

Advertisement