Advertisement
Advertisement
advertisement

Daimler India increases solar power installation at Chennai plant to 3.3 MW

German auto major Daimler has increased the solar energy capacity at its Chennai plant to 3.3 MW that would address the "one-fourth of the average daytime power" need for the facility.

Daimler India Commercial Vehicles, the subsidiary of Daimler AG, has taken solar power usage at the manufacturing facility to next level. With the completion of a major addition to the existing photovoltaic installations, the overall technical capacity increased from 0.8MW to 3.3MW

 

Advertisement
Advertisement

UPCOMING EVENTS

SolarQuarter Tweets

Follow Us For Latest Tweets

SolarQuarter SolarRoofs Karnataka 2019 is almost here! Buy your ticket today https://t.co/CVIqStbToI See you on Oct 04, 2019!… https://t.co/M0Yhv1lvRI
About 23 hours ago
SolarQuarter Smart Manufacturing Needs Smart & Clean Energy_Join Us For The Pune Edition - https://t.co/QrKk6xwU19
Friday, 16 August 2019 07:31
SolarQuarter Sri Lanka Solar Week 2019 is almost here! Buy your ticket today https://t.co/HSLG4PzL8E See you on Aug 29, 2019!
Thursday, 15 August 2019 04:30