Advertisement
Advertisement
advertisement

Energy firms Sprng Energy, Ayana and SoftBank Energy will set up a 750 MW Solar Power Park at NP Kunta in Anantapur district soon. It has been targeted to complete works within 8 to 10 months and start power production from the NP Kunta Solar Power Park.

Tags:

JinkoSolar Trading Private Limited - a JinkoSolar Holding Co., Ltd subsidiary ("JinkoSolar" or the "Company"), a global leader in the photovoltaic industry (PV), today announced that it successfully held another round of the PV Tech seminar at JW Marriott Sahar in Mumbai on Tuesday, 12th June 2018. The seminar aimed to raise discussions on upcoming module technologies and solar manufacturing excellence for enhanced efficiency and generation.

Tags: ,

Azure Power wins 75 MWs, highest allocation out of a 100 MW tender, in Assam

Azure Power, one of India’s leading independent solar power producers, announced that it has won the largest (75 MWs) solar power project in the North Eastern region of India. Azure Power will sign a 25 year Power Purchase Agreement with Assam Power Distribution Company Limited at a weighted average tariff of INR 3.37 per kWh. The project will be developed by Azure Power outside a solar park and is expected to be commissioned in 2019.

Tags: ,

The business case for nanogrids responds to many of the same arguments used to represent microgrids. These small, modular and flexible distribution networks are contrary to larger-scale economic scale thinking, which has guided energy planning for most of the past. Nanogrids pushes the bottom-up energy paradigm to the limit. In some cases, the business case expressed by the network is even more radical than the microgrid; in other cases, the nanogrid is in peace with the status quo.

Tags: ,

Page 9 of 39

Advertisement
Advertisement

UPCOMING EVENTS

SolarQuarter Tweets

Follow Us For Latest Tweets

SolarQuarter Tender Tracker: Insights Into 1200 MW SECI Auction Results ISTS IV https://t.co/qluWEzZDgg Solarquarter… https://t.co/FAtyZ57rla
Friday, 14 June 2019 11:20
SolarQuarter Auction Results: 1200MW ISTS Connected Solar PV Projects (ISTS-IV) Solarquarter tendertracker solar auction… https://t.co/7IDgiG8AZr
Friday, 14 June 2019 10:57
SolarQuarter EV100's EV Technology Awards, Who Will Win? - https://t.co/QHiiwL5Hgi
Wednesday, 05 June 2019 10:24