NewsPunjab Floats Tender for Setting Up 40 Kwp Batteryless Solar Power Plant...

Punjab Floats Tender for Setting Up 40 Kwp Batteryless Solar Power Plant at Ludhiana

Punjab Energy Development Agency (PEDA), invites e-tender for Design approvals and  Supply, Installation, Testing and Commissioning (SITC) of on grid connected net metering based 40 kwP batteryless solar power plant system at water works site.

Growatt

Location : Urban estate phase 2 dugri Ludhiana.

Bid Submission End Date: 30-Nov-2020 At 01:00 PM.

For more details refer to the document below :


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Also Read  Tata Motors, Welspun Renewable Energy Partner to Develop 86 MW Wind-Solar Hybrid Project

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

RELATED ARTICLES

Subscribe Today

GET EXCLUSIVE FULL ACCESS TO PREMIUM CONTENT

SUPPORT CLEANTECH JOURNALISM

EXPERT ANALYSIS OF AND EMERGING TRENDS

TOPICAL VIDEO WEBINARS

Get unlimited access to our EXCLUSIVE Content and our archive of subscriber stories.

Exclusive content this week

UPCOMING EVENTS

Latest article

More articles

- Advertisement -Newspaper WordPress Theme