waaree_jan
goodwemarch

Punjab Floats Tender for Setting Up 40 Kwp Batteryless Solar Power Plant at Ludhiana

0
1000
black and silver solar panels
Photo by Pixabay on Pexels.com

Punjab Energy Development Agency (PEDA), invites e-tender for Design approvals and  Supply, Installation, Testing and Commissioning (SITC) of on grid connected net metering based 40 kwP batteryless solar power plant system at water works site.

growatt_inside_jan

Location : Urban estate phase 2 dugri Ludhiana.

pixon_mar

Bid Submission End Date: 30-Nov-2020 At 01:00 PM.

hoymiles

For more details refer to the document below :

powernsun
Also Read  Adani Green Energy Ltd Announces 9M FY23 Results: EBITDA from Power Supply Increases by 44% YoY to Rs.3,570 Cr with High EBITDA Margin of 91.7%

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.