goodwemarch

BHEL Invites Bids For 500 MW Mono PERC Supplier For REWA Solar Park, Madhya Pradesh

0
485
rows of solar modules in photovoltaic power station
Adani Green Energy Arm to Acquire 50 % Equity in Essel Saurya Urja Company of Rajasthan

Bharat Heavy Electricals Limited (BHEL) has invited bids from manufacturers / suppliers of Mono crystalline Silicon PV Modules. This invitation is under a two part bid system for participating in 500 MW Rewa Ultra Mega Solar Limited (RUMSL) Solar Park tender at Neemuch in Madhya Pradesh. 27th April 2021 is the last date for bids.

growatt_inside_jan

The tender stipulates a minimum manufacturing capacity of 400 MW. Also, it mentions that a minimum of 50 MW of modules with a minimum 300Wp must be supplied in any one of the previous 3 years. As far as sourcing of module cells is concerned, no limitations have been placed.

The silicon PV modules need to have 72 cells and 12×6 configuration or 144 cells (half cut) with 24×6 configuration. The expected efficiency of the modules should be 19% under standard testing conditions, and the modules should perform satisfactorily in humidity up to 85% with ambient temperatures between -10°C and +65°C.

hoymiles
Also Read  SECI's Renewable Energy Power Trading Volume Soars by Over 59% in FY 2022-23, Crossing Rs. 10,000 Crore Mark

Multiple bidders can share the bid with a minimum bid size of 150 MW and preference to be given for Make in India. The price to be quoted is on a per KW basis, and not per module.

powernsun

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.