Sineng PV Inverter
Waaree Energies

KGPCL Issues 1.15 MW Floating Solar Tender in Karnataka

0
57

Reading Time: 2 minutes

growatt01-08-2022

KPC Gas Power Corporation Limited (KGPCL) invites bids from the qualified bidders through GOK e-procurement platform for 1.15 MWAC Floating Solar PV Plant at Yelahanka Combined Cycle Power Plant (YCCPP) Raw Water Pond, Bengaluru.

pixon energy

Scope of work includes Design, Engineering, Manufacturing, Quality Surveillance, Testing at Manufacturer’s Works, Packing, Supply, Delivery F.O.R Yelahanka Site, Erection, Testing, Commissioning and Conducting Performance Guarantee Tests With All Civil, Structural, Mechanical, Electrical, Control & Instrumentation Works Including One Year of Comprehensive Operation and Maintenance.

Earnest Money Deposit Amount is 9,22,500/. Project completion period is of 6 months.

Last date and time for submission of Tender is 30.07.2022 @ 17.00 Hrs
Date and time for opening of Technical Bid is 01.08.2022 @ 11.00 Hrs
Date and time for opening of Financial Bid is 02.08.2022 @ 12:00 Hrs

Bidder should have successfully commissioned at least 1 similar work of establishment of 500kW AC or above capacity FSPV plant in India & the same shall be in satisfactory operation for a minimum period of three months during the preceding 2 years, from the date of issue of NIT, with total Order value not less than Rs.3.40 Crores (single order).

Also Read  We Have Now Added 2000 MW With Our New Facility In Navsari, Leading To A Capacity Of 2.5 GW: Bharat Bhut – Co-founder & Director, Goldi Solar

Bidder during the last five financial year period shall have achieved minimum annual turnover of Rs.13.55 Crores for at least two financial years. As proof of the above, the audited balance sheet counter signed by Chartered accountant shall be furnished.

The successful bidder should submit the security deposit of 5% in the form of BG which will not carry any interest towards the EPC cost valid for the period of two years from the date of Commissioning of the plant. For the Operation & maintenance of the plant, performance guarantee of 5% of the O&M cost in the form of BG shall be submitted before commencement of O&M of plant with a validity of 18 months.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.