Sineng

ANERT Issues Tender For Implementation of 1 MW of Solar Power Plants

0
1308

Agency for New and Renewable Energy Research and Technology (ANERT) has e-invited bids from experience and eligible bidders to participate in the Request for Selection (RFS) of agency for the Implementation of Solar Power Plants of cumulative capacity of 1 MW at Government Medical College Campus, Thiruvananthapuram under Solar City project funded by Smart City Thiruvananthapuram Ltd.

Growatt

Scope of work is to Design, Supply, Engineering, Erection Testing, Commissioning of SPV Power Plant of cumulative capacity of 1 MWp with Grid connectivity along with 10 years of Operation & Maintenance. The bidder would have to manage the grid connectivity and metering of the solar project.

Last date for submission of bid is 15/02/2023 till 3.00 PM and bid (Techno-Commercial) opening date is 16/02/2023 @ 3.30 PM
Cost of Tender form Rs. 11,800/- (Including GST) and EMD amount is Rs. 2,00,000/-

Last month, in order to construct and commission 1.076 MW of grid-connected rooftop solar systems on 8 public buildings in Thiruvananthapuram, ANERT has issued an invitation for bids. The project was sponsored by a Special Purpose Vehicle, Smart City Thiruvananthapuram, established to carry out the Government of Indiaโ€™s Smart City Mission.

Also Read  MSEDCL Urges Cap On License Fees, Flags High Charges In MERC Draft Regulations 2026

In December last year ANERT issued an invitation for bids for the design, installation, provision, and commissioning of 1.232 MW of rooftop solar systems, which will be connected with the grid, on 71 public buildings.


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.