SOFAR
Sineng

Tata Power Solar Systems Secures ₹1,755 Crore Contract for 300 MW Solar Project with NLC India

0
605
alternative energy building clouds energy
Representational image. Credit: Canva

Tata Power Solar Systems Limited (TPSSL), one of India’s largest integrated solar companies and a wholly owned subsidiary of the Company has received the Letter of Award (LoA) of ₹ 1,755 crore for setting up a 300 MW Domestic Content Requirement (DCR) based EPC project for NLC India Limited (NLCIL), formerly called Neyveli Lignite Corporation Limited, as part of the CPSU scheme.

The project, located at Barsingar in Bikaner District, Rajasthan, is expected to generate more than 750 Mn. units and reduce 6 lakh tons of CO2 annually.

NLCIL has been a forerunner amongst the Public Sector Enterprises in the energy sector, with large scale lignite production and significant share in thermal and renewable power generation.

TPSSL will also do the operation and maintenance of the project for 3 years after the commercial operation declaration (COD). The LoA for the project was awarded through competitive bidding. The project will get commissioned within 18 months from the date of receiving of LoA. TPSSL will handle the complete project execution from designing to commissioning and the evacuation system up to delivery point (220KV side of pooling Sub-station).

Also Read  Kosol Energie Honoured at WISE Awards 2026 at National Women in Energy Summit

This win not only reinforces TPSSL’s leadership position in the execution of large solar projects but also establishes it as a preferred partner for driving the green energy transition in the country.

TPSSL has commissioned some of the most significant EPC and large-scale solar projects in the country. TPSSL is a trailblazer in developing and setting up customized renewable projects and with this win, its total portfolio will touch 11.5GWp. As on date, TPSSL’s total order book stands at about ₹ 17,000 crore.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.