si-neng

GreenYellow Completes 1.9MWp Solar Power Project At Bakheng Water Treatment Plant In Cambodia

0
130
Representational image. Credit: Canva

GreenYellow announces the successful completion of Phase I of the Bakheng Water Treatment Plant Solar Power project in Cambodia, boasting a capacity of 1.9MWp.

growatt_inside_jan

The Bakheng Water Treatment Plant is a pivotal water supply and treatment facility in Cambodia, capable of delivering up to 390,000 m3/day (Phase 1: 195,000 m3/day) to areas encompassing Phnom Penh City and Takmao Street at the border. The 1.9 MWp project, featuring 3,500 solar panels, will provide clean energy to the plant, contributing to a significant reduction in carbon emissions.

Green Yellow Cambodia (GYC) takes immense pride in its role as the design, installation, and commissioning entity for this vital national endeavor in water treatment and supply. The successful collaboration between GreenYellow Cambodia and VINCI Construction Grand Projects (VCGP), under the oversight of the Phnom Penh Water Supply Authority (PPWSA), underscores the commitment to sustainable energy solutions in Cambodia.

hoymiles

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.