The Karnataka Electricity Regulatory Commission issued an order on July 9, 2025, to determine the tariff and norms for solar power projects for the financial year 2025โ2026. This applies to both grid-connected megawatt-scale ground-mounted solar projects and kilowatt-scale distributed solar photovoltaic (DSPV) plants, including rooftop and other eligible structures. The tariff order comes after public consultations, stakeholder feedback, and a public hearing held on June 6, 2025.
The Commission approved a benchmark tariff of โน3.07 per unit for MW-scale ground-mounted solar projects. For distributed solar systems (excluding domestic users), the tariff is set at โน3.08 per unit. For domestic consumers with systems between 1 kW and 10 kW, the tariff is โน3.86 per unit without subsidy. Under the PM Surya Ghar Muft Bijli Yojana, domestic users will pay โน2.30 per unit for 1โ2 kW systems, โน2.48 for 2โ3 kW systems, and โน2.93 for systems above 3 kW.
The order introduces a new approach by renaming โSolar Rooftop PVโ as โDistributed Solar PV Plants,โ expanding the permitted installation areas to include rooftops, elevated ground structures, and building facades. It also allows Virtual Net Metering (VNM) and Group Net Metering (GNM), enabling energy credit sharing between multiple consumers or service connections under certain conditions. These features are designed to encourage broader solar adoption and reduce grid dependency.
For domestic consumers installing systems up to 150 kW, the need for a Power Purchase Agreement (PPA) has been eliminated. The online application itself will serve as approval for installation, simplifying the process. Distribution licensees must now follow fixed timelines for application approval, site inspection, and commissioning, with penalties for delays.
The Commission allowed open access consumers to opt for net or gross metering or establish captive plants, but any excess energy injected into the grid will not be compensated. It also permitted the relocation of DSPV installations within the same licenseeโs area without changes in the original PPA.
Technical norms and financial assumptions were retained largely from previous years. These include a 25-year project life, 70:30 debt-equity ratio, 19% capacity utilization factor, and interest rates of 11.10% for debt and 11.50% for working capital. Operation and maintenance costs were fixed at โน791.31/kW for DSPV and โน5.945 lakh/MW for ground-mounted systems, with an annual escalation of 5.72%.
The capital cost for domestic DSPV is โน40,000 per kW, โน30,000 per kW for other DSPV users, and โน321.53 lakh per MW for ground-mounted projects. Battery Energy Storage Systems (BESS) were not mandated due to cost concerns, despite earlier proposals.
Additional provisions were included for smart metering, hybrid inverters, and clarity on multiple installations. The approved tariffs are applicable for projects commissioned between July 1, 2025, and June 30, 2026, and the PPA tenure is set at 25 years.