NewsNTPC Expands Renewable Energy Capacity, Total Installed Power Reaches 84,931 MW

NTPC Expands Renewable Energy Capacity, Total Installed Power Reaches 84,931 MW

NTPC Limited, a Government of India enterprise, has announced an increase in its renewable energy capacity following the declaration of the Commercial Operation Date (COD) for a portion of a wind power project. The announcement was made through a disclosure by Executive Director (Finance) Aditya Dar to the National Stock Exchange of India Limited and BSE Limited on December 10, 2025, under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. The disclosure included a submission dated December 9, 2025, from its subsidiary, NTPC Green Energy Limited (NGEL).

Growatt

According to the subsidiary’s update, a part capacity of 6.6 MW from a wind power project was declared on commercial operation, effective from December 11, 2025. This project is part of a larger 100 MW hybrid renewable energy initiative located in Bhuj, Gujarat. The 6.6 MW capacity belongs to Ayana Renewable Power Four Private Limited, which is a subsidiary of Ayana Renewable Power Private Limited, itself wholly owned by the joint venture ONGC NTPC Green Private Limited. This development highlights NTPC’s continued focus on expanding its renewable energy portfolio, particularly in wind power, which forms a key component of the company’s sustainability and clean energy transition strategy.

With the addition of this 6.6 MW capacity, NTPC Green Energy Limited has updated its total commercial capacity to 7,639.075 MW. The total installed capacity of NGEL has now increased to 7,645.675 MW. For the larger NTPC Group, this addition means that its total installed and commercial capacity has reached 84,931 MW. The incremental capacity, though a part of a larger hybrid project, reinforces NTPC’s commitment to integrating renewable energy into its overall energy mix, supporting India’s clean energy and Net-Zero objectives.

Also Read  India Daily: NTPC REL Secures 500 MW, POWERGRID Tenders 265 MW BESS, RE Generation Crosses 38,497 MU, REC Transfers Luhri SPV, OREDA Tenders Rooftop Solar, POWERGRID Wins ₹822.91 Cr Project, KELTRON Tenders Solar Projects

NTPC Green Energy Limited continues to play a pivotal role in driving NTPC’s renewable energy ambitions. By actively commissioning wind projects and hybrid renewable installations, the company is contributing to a sustainable energy future while complementing the government’s vision of promoting green power generation. This focus on renewable capacity growth is part of NTPC’s broader strategy to diversify its energy portfolio, reduce carbon emissions, and strengthen the adoption of environmentally responsible energy solutions across India.

The disclosure was signed by Manish Kumar, Company Secretary and Compliance Officer of NTPC Green Energy Limited, reaffirming the company’s transparent reporting of renewable capacity additions. NTPC’s registered office is located at NTPC Bhawan, SCOPE Complex, Lodi Road, New Delhi, with NGEL’s corporate office based in NETRA Complex, Greater Noida, Uttar Pradesh. The latest addition underscores NTPC’s ongoing efforts to expand its renewable energy footprint and consolidate its position as a leading clean energy provider in India.


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

RELATED ARTICLES

Subscribe Today

GET EXCLUSIVE FULL ACCESS TO PREMIUM CONTENT

SUPPORT CLEANTECH JOURNALISM

EXPERT ANALYSIS OF AND EMERGING TRENDS

TOPICAL VIDEO WEBINARS

Get unlimited access to our EXCLUSIVE Content and our archive of subscriber stories.

Exclusive content this week

UPCOMING EVENTS

Latest article

More articles

- Advertisement -Newspaper WordPress Theme