The Rajasthan Electricity Regulatory Commission (RERC) has rejected a petition filed by Shri Om Agro Products seeking compensation for unused wind power injected into the electricity grid between 2015 and July 2024. In its order dated November 17, 2026, the Commission ruled that power distribution companies (Discoms) were not contractually required to pay for electricity generated under the captive power arrangement before a supplementary agreement was executed.
The petition was heard by a three-member bench headed by RERC Chairman Dr. Rajesh Sharma. Shri Om Agro Products, a guar gum manufacturer and exporter based in Jodhpur, had commissioned a 1.5 MW wind power plant in Jaisalmer district in March 2013 under a 25-year agreement.
Under the original Power Purchase Agreement-cum-Wheeling and Banking Agreement (PPA-cum-WBA), signed on March 28, 2013, 50% of the electricity generated was to be sold to the Discom at Rs. 4.89 per unit, while the remaining 50% was reserved for captive consumption at the company’s manufacturing facility.
However, following a significant decline in demand for guar gum, the company’s factory electricity consumption dropped considerably, leaving much of its allocated captive power unused. In 2015, the company approached the authorities seeking a revision of the power-sharing arrangement to allocate 95% of generation for sale to the Discom and 5% for captive consumption. It subsequently proposed selling 100% of the generated electricity to avoid wheeling and transmission charges.
The company argued that the unused captive electricity was injected into the grid and utilized by the Discoms, despite the company continuing to bear applicable grid charges. It also attempted to transfer the arrangement to Shri Nath Gum and Chemicals in 2020, but the proposal could not proceed due to technical limitations.
Eventually, Shri Om Agro Products offered to sell its remaining 50% captive share to the Discom at Rs. 2.44 per unit. After clearing outstanding dues in December 2023, the company received approval from the Commission in June 2024. A supplementary PPA was subsequently signed on July 15, 2024.
The company then approached RERC under Section 86(1)(f) of the Electricity Act, 2003, seeking compensation with interest for the electricity injected into the grid between 2015 and 2024. Its pleadings referred to compensation rates of Rs. 2.44 and Rs. 4.89 per unit.
However, the respondents, including Rajasthan Urja Vikas and IT Services Limited, Jodhpur Vidyut Vitran Nigam Limited, Ajmer Vidyut Vitran Nigam Limited and Rajasthan Renewable Energy Corporation Limited, opposed the claim. They maintained that no agreement existed to purchase the captive share before July 2024.
RERC observed that the original agreement did not provide for purchasing the captive power allocation. It further clarified that permission to inject electricity into the grid for captive consumption did not establish any entitlement to payment from the Discoms. The Commission also rejected the company’s reliance on Section 70 of the Indian Contract Act, 1872, and declined to consider an additional banking-settlement claim raised after the hearings had concluded.
With this ruling, RERC dismissed Shri Om Agro Products’ compensation petition, finding no contractual basis for payment for the disputed period.