The Bihar State Power Generation Company Limited (BSPGCL), under the Government of Bihar, has invited bids for the development of a 500 MWh standalone Battery Energy Storage System (BESS) at Kajra in Lakhisarai district. The project will have a capacity of 125 MW with a four-hour storage duration and will be developed under the Tariff-Based Competitive Bidding (TBCB) framework on a Build, Own, Operate and Transfer (BOOT) basis. The land required for the project will be provided by BSPGCL.
The tender, issued under System Tender No. 139120 and Tender Reference No. 07/PR/BSPGCL/2026, seeks to select a Battery Energy Storage System Developer (BESSD) through an open competitive bidding process. The procurement follows an item-rate bidding format with two bid parts. Bids will be evaluated based on the L1 ranking system, with a minimum requirement of two bids. The offer validity period has been specified as 365 days.
Interested bidders are required to submit an Earnest Money Deposit (EMD) of ₹13 crore. The EMD can be paid through an Internet Payment Gateway (IPG), challan or bank guarantee in Indian rupees. The tender fee has been fixed at ₹29,500, while the tender processing fee is ₹11,800. Both fees are payable through IPG or challan, and exemptions from these payments are not permitted. The available tender information does not specify a fixed Performance Bank Guarantee (PBG) amount. Bidders will need to refer to the Request for Selection (RfS) and Battery Energy Storage Purchase Agreement (BESPA) documents for the applicable requirements.
The bid submission process began on September 2, 2026, at 3:00 PM. A pre-bid meeting was scheduled for September 8, 2026, from 11:00 AM to 12:00 PM at the Conference Hall, fifth floor, Vidyut Bhawan-1, Bailey Road, Patna. Online participation arrangements were also made available through email. The deadline for online bid submission and physical document submission is November 27, 2026, at 4:00 PM, while bids are scheduled to open on the same day at 5:00 PM.
The tender documentation includes the notice dated August 18, 2026, RfS and BESPA documents, project location KMZ files, a 132 kV switchyard single-line diagram, geotechnical and hydrology reports, pre-bid clarifications, amendments and extension notices issued up to October 29, 2026.
To qualify, bidders can participate individually or as a consortium. They must submit corporate, tax and financial information, including net worth and PBDIT for FY 2024-25, average annual turnover for FY 2022-23 to FY 2024-25, and credit line commitments. Technical eligibility requires cumulative experience in grid-connected BESS projects of at least 5 MWh, with a minimum of 1 MWh per project, or details demonstrating domestic lithium-ion or superior battery manufacturing capacity.
Under Clause 3.21, BSPGCL retains the right to reject bids or cancel the bidding process at any stage without assigning reasons or incurring liability.