Saturday, June 20, 2026

Home News UERDA Issues EOI For Empanelment of EPC Contractors for Upto 500kW Grid-connected...
Sineng

UERDA Issues EOI For Empanelment of EPC Contractors for Upto 500kW Grid-connected Rooftop Projects

0
1603

The Uttarakhand Renewable Energy Development Agency (UREDA) has issued Expression of Interest(EOI) for Empanelment of EPC contractors for installation of Grid-connected Rooftop and small Solar Power Plant.

Growatt

The Scope of work for the bidders includes Designing, manufacturing, supply, erection, testing, net metering, and commissioning including Annual Maintenance Contract AMC for 5 years Of 1KWp to 500 KWp Grid Connected Rooftop and Small Solar Power Plant at various locations in the State of Uttarakhand.

The last date for bid submission is 5 June 2020, and the Bid Opening Date is 11 June 2020. The last date of clarification regarding this tender is 05-Jun-2020. Along with the bid bidders will have to submit an Earnest Money Deposit (EMD) of Rs 5 lakh and document fee of Rs 11800/-. The Bid will be valid for 90 days and the Period Of Work is 365 days.

The selected firms will be empaneled for a period of 1 year after that the validity of rates may be extended based on the performance of the firms and mutual consent between UREDA and interested firms.

Also Read  ReNew Energy Global Commissions 2.4 GW In FY2026, Expanding Operating Capacity To 12.6 GW Across India

The eligibility to participate in this tender is the bidder should at least have an annual turnover of Rs 25 Lacs. Bidder should have experience of supply, installation, and commission of solar PV projects ranging from 100-500 kWp.An added advantage will be the bidder’s company which is registered in Uttarakhand and sales and service center in Uttarakhand.

Recently, The Power and Electricity Department, Government of Mizoram, has issued Request for Selection (RfS) Document for Empanelment of Developers for 500 kWp Grid connected Rooftop SPV Power Plants in different locations for Residential Sector in the state of Mizoram. The scope of work includes Design, Manufacture, Testing, Supply, Installation & Commissioning of Grid-connected Rooftop SPV Power Plants Including five years Comprehensive Maintenance Contract (CMC). The last date for the submission of online bids is 21.05.2020 up to 4:00 PM and the Technical Bid Opening Date is 22.05.2020 at 11:00 AM. A pre-bid meeting is scheduled on 15.05.2020 at 11.30 A.M. The Estimated cost of the project is Rs. 2.95 crores and Period of empanelment is 12 Months.

Also Read  SECI Floats Tender For 10 MW Solar Project Connectivity With 5-Year Internet Leased Line Services

Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Discover more from SolarQuarter

Subscribe now to keep reading and get access to the full archive.

Continue reading