The Kerala State Electronics Development Corporation Ltd (KSEDC) has invited  Short Term Expression of Interest (EoI) for empanelment of agencies and EPC contractors for the installation of grid-interactive hybrid solar rooftop power plant.

growatt_inside_jan

The Last Date & Time of online Submission of Bid document is  30/05/2020 is at 18:00 Hrs.

Antai

Date & Time of Opening of Technical Bids (cover 1) is  03/06/2020.There is no pre bid scheduled for this tender.

hoymiles

To be eligible for this bid the bidder shall have executed Hybrid plants in India,should have Min 15 service centers across the state of Karnataka (details of service engineers with name and contact numbers to be provided).The OEM should have installed Hybrid inverter Plants of cumulative 2.5 MW capacity in any Government organization during past 5 years (Supporting document should be provided along with bid ) .The bidder should be a profit making company for last three years and should have annual turn over of min 40 Cr in for last 3 year (2016-17), (2017-18) and (2018-19).  Bidders should have  Manufacturer’s authorization certificate(Solar Panel,Hybrid Inverter,Battery) and  Work Completion Certificate for 2.5MW Hybrid Grid Interactive Solar Power Plant duly signed by the end user.

Also Read  GERC Announces Revised ₹0.87/kWh Additional Surcharge Rates For Open Access Consumers For The Period October 1, 2023, To March 31, 2024

The tender states that “Only crystalline silicon cell PV modules of 300Wp or higher capacity (Indian Module) should be used in the power plant. 2.Each PV module used in any solar power project must use a RF identification tag (RFID), which must contain the following information. The RFID can be inside or outside the module laminate, but must be able to withstand harsh environmental conditions.”

Document mentions that Only crystalline silicon cell PV modules of 300Wp or higher capacity (Indian Module) should be used in the power plant. 2.Each PV module used in any solar power project must use a RF identification tag (RFID), which must contain the following information. The RFID can be inside or outside the module laminate, but must be able to withstand harsh environmental conditions. 

Proposed Grid Interactive Hybrid Solar PhotoVoltaic (SPV) power plant consists of SPV array, Module Mounting Structure, Battery bank, & Hybrid Solar Inverter, AJB, DCDB, ACDB, L.A, Earth kits, Interconnect cables & Civil works. . 

Also Read  China's CEEC-SEPEC Pays a Visit to Sungrow Australia in Sydney 

The predicted electrical degradation of power generated by SPV modules should not exceed 20% of the minimum rated power over the 25 year period and not more than 10% after ten years period of the full rated original output.  

Empanelment would be for a period of 3 years from the date of issuance of empanelment letter/agreement subject to satisfactory services and yearly review. 

It has been highlighted that “No Applicant shall contact KSEDC on any matter relating to its application, from the time of opening to the time the empanelment process is complete.”

Recently, Government of Karnataka (GOK) has floated an Invitation for Short Term Expression of Interest (EOI) for Empanelment of Agencies/ EPC contractors for Installation of Grid-Interactive Hybrid Solar Rooftop Plant at different offices of RD&PR, ZP, TP  and GP s across Karnataka. The Project will be executed on turnkey basis and the bidding process is carried out as per Two-Stage Tender System. The scope of work for this project is design, supply, and installation of the rooftop plant along with 5 years of maintenance of the Project. 