Kerala State Electricity Board Limited(KSEBL) invites competitive bids from domestic bidders for bidders for appointment of EPC Contractor for setting up 1.5 MWp Grid tied ground mounted Solar PV plant.

growatt_inside_jan

The location of this project is at Nenmara, Kerala.

Antai

Last date & time of online Submission is 09.09.2020 at 3.30 pm. Opening of PQ Bids is 16.09.2020 at 11:30 am and the last date to submit queries is 18.08.2020.

hoymiles

Scope of successful bidder includes Engineering, Procurement and Construction (EPC) Contractor for the design, supply, installation, testing and commissioning of 1.5 MWp Grid tied ground mounted Solar PV plant along with Operation and Maintenance of the plant for the first 5 years from the date of commissioning.

The total tender value is Rs 8,08,96,000.

To know more about the bids refer to document below:

Recently, National Hydroelectric Power Corporation (NHPC) floated a tender for Engineering, Procurement & Construction (EPC) Contract for 50 MW capacity Floating Solar PV Power Project.

Also Read  GreenGo Energy Proposes Massive Green Energy Park in Mauritania, Aiming for NetZero Impact

The location of this project at West Kallada in the State of Kerala.

The last date of bid submission is 11.08.2020 at 14:30 Hrs.Last date of Offline Bid submission is 14.08.2020 at 14:30 Hrs and the last date of online Bid is 17.08.2020 at 15:00 Hrs.The opening date & time of e-Reverse Auction will be initiated separately by NHPC.

The scope of the work of the project includes Design, Engineering, manufacture, supply, construction, erection along with its Comprehensive Operation and Maintenance for 10 years.