MNRE Issues Guidelines On Inspection Fee For Solar Manufacturing Capacity upto 50 MW

0
455
Representational image. Credit: Canva

The Ministry of New and Renewable Energy (MNRE) has notified that under its guidelines for the enlistment under its order for “Approved Models and Manufacture of Solar PV modules (Requirement for Compulsory Registration), it has revised the inspection fee for manufacturing capacity upto 50 MW to Rs 2.5 lakh from the existing Rs 5 lakh.

The fee was revised for category Iupto 50 MW capacity. For units situated in the SAARC (South Asian Association Regional Cooperation) countries, the price for capacity between 50 and upto 100 MW, More than 100 MW and upto 250 MW, and more than 250 MW, the inspection fee has remained the same at Rs 5 lakh, Rs 10 lakh and Rs 15 lakh respectively.

For details refer below document


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.