Request For Expression Of Interest For Further Empanelment Of Epc-cum-o&M Contractors For Development And O&M Of Ground Mounted/Floating Solar Pv Power Projects Of Coal India Ltd., And Its Subsidiarie Request For Expression Of Interest For Further Empanelment Of Epc-cum-o And M Contractors For Development And O And M Of Ground Mounted/Floating Solar Pv Power Projects Of Cil And Its Subsidiaries.

The scope of work shall include but not limited to Design, Engineering, Testing, Supply, Packing and Forwarding, Transportation, Unloading, Storage, Installation and Commissioning of grid connected floating and/or ground mounted Solar PVprojects (to be awarded to multiple/single bidders/applicants) on turnkey basis, as well as Comprehensive Operation & Maintenance of the project for a period of five (5) years from the date of successful commissioning

Bid Submission End Date 08-Jun-2021 12:00 PM

Bid Opening Date 09-Jun-2021 12:00 PM

Accordingly, CIL plans to empanel EPC-cum-O&M Contractors meeting the specified eligibility criteria and willing to be associated with CIL for development and O&M of
its upcoming solar PV projects. The EPC-cum-O&M Contractors will be empaneled for two different categories based on the capacity of the Solar PV plants: Category-I Up to 100 MWp and Category-II Above 100 MWp

For the purpose of Empanelment, the Applicants shall be evaluated on the basis of Eligibility Criteria. The Applicant would be liable to disqualification if he has made misleading or false representation or has deliberately suppressed the information in the forms, statements and enclosures required in the Application for
Empanelment.

The EPC contractor who have already been empaneled in the month of Feb 21 at CIL need not apply for this empanelment.

Technical Eligibility Criteria: For Category-I:
a) The Applicant should have successfully designed, supplied, erected / supervised erection, and commissioned / supervised commissioning of Solar Photo Voltaic-based grid connected power plant(s) of cumulative installed capacity of 60 MWp or higher in the last five (5) financial years including the financial year in which the Application has been submitted, out of which at least one plant should have been of 10 MWp or higher capacity installed at a single location. The reference plant of 10 MWp or higher capacity must have been in successful operation for at least six (6) months prior to the last date of submission of application for empanelment.
OR;
b) The Applicant should be a developer of Solar Photo Voltaic-based grid connected power plant(s) of cumulative installed capacity of 60 MWp or higher that have been successfully commissioned in the last five (5) financial years including the financial year in which the Application has been submitted, out of which at least one plant should have been of 10 MWp or higher capacity installed at a single location. The reference plant of 10 MWp or higher capacity must have been in successful operation for at least six (6) months prior to the last date of submission of application for empanelmen

For Category-II:
a) The Applicant should have successfully designed, supplied, erected /supervised erection, and commissioned / supervised commissioning of Solar Photo Voltaic-based grid connected power plant(s) of cumulative installed
capacity of 150 MWp or higher in the last five (5) financial years including the financial year in which the Application has been submitted, out of which at least one plant should have been of 50 MWp or higher capacity installed at a single location. The reference plant of 50 MWp or higher capacity must have been in successful operation for at least six (6) months prior to the last date of submission of application for empanelment.
OR;
b) The Applicant should be a developer of Solar Photo Voltaic-based grid Request for EOI: Empanelment of Solar PV Power Project EPC-cum-O&M contractors connected power plant(s) of cumulative installed capacity of 150 MWp or higher that have been successfully commissioned in the last five (5) financial years including the financial year in which the Application has been submitted, out of which at least one plant should have been of 50 MWp or higher capacity installed at a single location. The reference plant of 50 MWp or higher capacity must have been in successful operation for at least six (6) months prior to the last date of submission of application for empanelment.