goodwe september

BHEL Invites Tender for Supply of 28.6 Lakh Mono PERC Solar Cells

0
42
BHEL Invites Tender for Supply of 28.6 Lakh Mono PERC Solar Cells

Reading Time: 2 minutes

Contendre

Bharat Heavy Electricals Limited (BHEL) invites offers from reputed Vendors for supply including packing & transportation to as per incoterms, satisfactory completion of Supply of “MONO PERC SOLAR CELL, 5BB, 158.75mm >5.54Wp.

pixon september

Offer shall be submitted in two parts strictly as per “Instructions to Bidders” in sealed covers.

It shall be the responsibility of the bidder to ensure that the tender is delivered on or before 15 September by 02:00 P.M. The offer has to be deposited in tender box only. Part‐I bids shall be opened at 02:30 P.M. on the same day in the presence of authorized representatives of the bidders, who may like to be present.

  1. The cells shall be of ‘A’ category without any Visual defects.
  2. Cell should not have any edge chips or any visible crack or deep scratches.
  3. Cell should not have any printing defects. Cells shall not have any misalignment (of bus-bars)
  4. on the either surface. Cells must have precise printing & superior silver contacts for ease of automatic soldering.
  5. Cell should not have print shift, finger knots other printing defects of more than 0.5 mm on width and 3.0 mm on length.
  6. Cell shall not have bus bar or grid line interruptions, finger print interruptions, finger breaks, stains or paste smudges on either surface etc.
  7. Cells shall have homogenous Silicon Nitride coating. There shall not be any colour variations.
  8. Bus line Silver shall not be tarnished or oxidized.
  9. Cell shall not have Micro Crack, Dark Area, Dark Spot & Dead cell.
Also Read  India Working to Transform Its Energy Landscape with Significant Clean Energy Share: Minister Jitendra Singh

PACKING CONDITIONS:

  1. Cell shall be vacuum / air tight packed with heat shrinkable sleeve or polythene / polypropylene sachets of not more than 125 cells per sachet.
  2. Sachets shall be packed in foam / thermocol boxes with soft pads on both ends or in polyethylene foam packing to absorb transit handling shocks.
  3. Packing of sachets shall be in carton boxes with soft spacers & bubble wrap.
  4. The final packing shall be with suitable pallet for mechanised handling.
  5. Manufacturer name, Cell type, Lot number, Wattage/ efficiency, Quantity, date of manufacture to be identified on each sachet. Total quantity of cells in each carton to be displayed.
  6. Each pallets shall have marking of BHEL PO No. and item description etc. for traceability.

For more details view tender document:

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.