South Eastern Coalfields Limited has announced the invitation of online tenders for an ambitious project involving the design, engineering, construction, and commissioning of a grid-connected floating solar photovoltaic (PV) power plant.
Project Overview:
- Description: The project involves a 1.5 MW (AC) floating solar PV power plant with a minimum 30% DC overload capacity, covering all civil, structural, electrical works, power evacuation arrangements, and other necessary facilities. The scope also includes operation and comprehensive maintenance of the plant during a 10-year Defect Liability Period (DLP) on a turnkey basis.
- Location: Sharda OC, Sohagpur Area, SECL.
- Estimated Cost (Excl. GST): ₹11,73,61,000
- GST on Estimated Cost: ₹1,66,27,000
- Total Cost (Incl. GST): ₹13,39,88,000
- Earnest Money: ₹16,74,900
- Completion Period: 4015 days (11 years), divided into 365 days for construction, trial run, and commissioning, and 3650 days for operation and maintenance during the DLP.
Tender Schedule:
- Tender e-Publication Date: July 16, 2024, 17:00 hours
- Document Download Start Date: July 16, 2024, 17:00 hours
- Document Download End Date: August 10, 2024, 17:00 hours
- Bid Submission Start Date: July 23, 2024, 17:00 hours
- Bid Submission End Date: August 10, 2024, 17:00 hours
- Start Date for Seeking Clarifications Online: July 16, 2024, 17:00 hours
- Last Date for Seeking Clarifications Online: August 3, 2024, 17:00 hours
- Pre-Bid Meeting: July 19, 2024, 11:00 hours
- Technical Bid Opening Date (Part-I): August 12, 2024, 11:00 hours
- Price Bid Opening Date (Part-II): To be notified later
Key Notes:
- If fewer than three bids are received by the deadline, the submission and opening dates will be extended by four days.
- The employer reserves the right to issue corrigendum/addendum, binding on all bidders.
- Earnest Money Deposit (EMD) must be paid online via net-banking or NEFT/RTGS.
Eligibility Criteria:
- Work Experience:
- Three similar completed works, each costing at least 20% of the estimated cost.
- Two similar completed works, each costing at least 25% of the estimated cost.
- One similar completed work costing at least 40% of the estimated cost.
- Definition of Similar Work: Projects involving design, supply, installation, commissioning, and testing of Solar PV grid-connected power plants (ground-mounted, rooftop, or floating).
- Financial Turnover: Average annual turnover during the last three years must be at least 30% of the estimated cost.
- JV/Consortium: Allowed for projects above ₹5 crores. JV partners must fulfill specific share and qualification criteria.
Bid Submission:
- Online Portal: https://coalindiatenders.nic.in
- Requirements: Digital Signature Certificate (DSC) issued by any agency authorized by the Controller of Certifying Authority (CCA), Govt. of India.
- This project represents a significant step towards integrating renewable energy solutions within CIL’s operations, reflecting the company’s commitment to sustainable development.