NewsNaturgy Enhances Renewable Energy Operations with State-of-the-Art Control Centre in Spain

Naturgy Enhances Renewable Energy Operations with State-of-the-Art Control Centre in Spain

Naturgy has successfully integrated the management of all its solar and wind energy operations in Spain into a modernized facility designed to enhance the efficiency and environmental sustainability of its renewable energy assets. The newly established Renewable Control Centre (CCR), located in A Coruña, will also monitor the company’s renewable production in other countries where it operates, offering greater operational flexibility.

Growatt

The CCR oversees 93 wind farms, 24 photovoltaic plants, and 5 cogeneration plants across Spain, alongside two wind farms in Mexico, totaling more than 3.48 GW of installed capacity. The center enables optimized operations by adjusting based on the availability of each facility. Equipped with cutting-edge information systems and cybersecurity features, it ensures the safe and efficient management of current and future renewable projects.

Meanwhile, the management of hydroelectric generation will continue at Naturgy’s Integrated Control Centre (ICC) in Ourense. This center, responsible for overseeing 47 power plants and 23 large dams across Spain, is equipped with advanced control systems and tools, providing 24/7 responses to electrical system demands while adhering to stringent safety protocols. Its inauguration in 2017 marked a significant leap in technology integration, consolidating R&D and operational oversight into one decision-making environment.

Naturgy’s investment in renewable energy technologies continues to grow, with a commitment to the energy transition. In the first half of 2024, the company invested €937 million in renewable developments and networks. This investment reflects Naturgy’s drive to shift to a more sustainable energy mix, aligning with its environmental, social, and governance (ESG) goals.

Also Read  Servotech Renewable Secures 900 kW Hybrid Solar Rooftop and BESS Project from UPSRLM in Uttar Pradesh

As of Q3 2024, Naturgy’s global generation capacity reached 6.9 GW, with 5.3 GW located in Spain. Wind energy now constitutes half of the company’s installed renewable capacity, with solar energy accounting for 1.3 GW across Brazil, Chile, the United States, and Spain. Additionally, hydroelectric energy represents 2.2 GW of installed capacity, with 2.1 GW in Spain and 0.1 GW in Costa Rica and Panama.


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

RELATED ARTICLES

Subscribe Today

GET EXCLUSIVE FULL ACCESS TO PREMIUM CONTENT

SUPPORT CLEANTECH JOURNALISM

EXPERT ANALYSIS OF AND EMERGING TRENDS

TOPICAL VIDEO WEBINARS

Get unlimited access to our EXCLUSIVE Content and our archive of subscriber stories.

Exclusive content this week

UPCOMING EVENTS

Latest article

More articles

- Advertisement -Newspaper WordPress Theme