Sunday, June 21, 2026

Home News Eurohold Bulgaria and 360 Energy Commission 161-MWp Hybrid Solar Project with BESS...
Sineng

Eurohold Bulgaria and 360 Energy Commission 161-MWp Hybrid Solar Project with BESS at Bulgaria’s Maglizh Plant

0
176
Representational image. Credit: Canva

Eurohold Bulgaria and 360 Energy have commissioned a battery energy storage system (BESS) at a 161-MWp solar photovoltaic (PV) facility in Bulgaria, upgrading the project into a hybrid renewable energy asset.

Growatt

The BESS has been installed at the Maglizh solar park in south-central Bulgaria, enhancing the plant’s operational flexibility by enabling storage of surplus solar generation and improved dispatch during peak demand periods.

With the integration of battery storage, the 161-MWp facility is expected to deliver more stable power output, reduce intermittency-related challenges, and support greater grid reliability within Bulgaria’s evolving renewable energy framework.

The upgrade reflects the growing shift across European renewable markets toward hybridisation of solar assets, where co-located storage is increasingly deployed to optimise asset performance, improve market participation, and reduce curtailment risks.

The Maglizh project now operates as a combined solar-plus-storage installation, positioning it as a key example of Bulgaria’s accelerating transition toward integrated clean energy infrastructure.


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Discover more from SolarQuarter

Subscribe now to keep reading and get access to the full archive.

Continue reading