The Rajasthan Electricity Regulatory Commission (RERC) has ruled that a rooftop solar power project installed before the introduction of the Rajasthan Solar Energy Policy, 2019, cannot claim exemptions or concessions provided under the policy retrospectively. The decision came in Petition No. RERC/2392/2026 filed by M/s Agrawal Metal Works Private Limited against Jaipur Vidyut Vitran Nigam Limited (JVVNL) and Rajasthan Urja Vikas and IT Services Limited.
The dispute concerned a demand notice of ₹5,68,47,990 issued by JVVNL towards fixed charges, cross-subsidy surcharge (CSS), additional surcharge, electricity duty and water conservation cess following the installation of a rooftop solar power plant at the petitioner’s manufacturing facility in Jaipur.
Agrawal Metal Works, a manufacturer of copper and copper alloy products, had entered into a power purchase agreement (PPA) with Sun Source Energy Private Limited in May 2018 for installing a 1,784.9 kW DC rooftop solar project under the Renewable Energy Service Company (RESCO) model. The project was developed behind the consumer’s meter and received electrical inspection clearance in February 2019.
The petitioner argued that the solar installation was eligible for benefits under the Rajasthan Solar Energy Policy, 2019, and subsequent grid-interactive regulations. It also maintained that the necessary information about the installation had been submitted to the distribution company within the prescribed timelines. Based on these arguments, the company challenged the charges imposed by JVVNL.
However, JVVNL opposed the petition, stating that the solar plant had been installed in 2018, before the introduction of the 2019 policy. Therefore, the provisions of the policy could not be applied retrospectively. The discom also alleged that the petitioner had failed to submit mandatory installation-related intimations within the required timeframe. It further questioned the authenticity of a letter dated June 30, 2021, submitted by the petitioner as evidence of intimation, claiming that the document was forged and that an internal committee had investigated the matter.
After examining the submissions, RERC agreed that the petitioner could not claim specific concessions under the 2019 policy for a project established before its implementation.
On the disputed intimation issue, the Commission observed that verifying whether the letter dated June 30, 2021, had actually been received involved disputed questions of fact. Such matters would be more appropriately examined by the Consumer Grievance Redressal Forum (CGRF) or another competent authority.
However, RERC clarified that any liability towards fixed charges arising from non-intimation could only be imposed up to June 30, 2023, or February 8, 2024, the dates on which JVVNL formally acknowledged its awareness of the solar installation.
Regarding cross-subsidy and additional surcharges, the Commission held that electricity procured from a third-party RESCO developer falls within the scope of open access regulations. Accordingly, both surcharges are applicable to the electricity supplied by the solar project during the relevant period.
The Commission also clarified that electricity duty and water conservation cess fall outside its regulatory jurisdiction. The petitioner may approach the appropriate government authorities to challenge these charges. With these observations and directions, RERC disposed of the petition.