EAST has successfully grid-connected its 200 MW/800 MWh independent energy storage project in Jiuduntan, Liangzhou District, Wuwei, Gansu Province, China. Located within a photovoltaic (PV) and desertification control demonstration park, the four-hour storage project is expected to enhance regional power system flexibility and support the integration of renewable energy.
The project uses EAST’s self-developed 6.7 MW/26.8 MWh liquid-cooled energy storage systems, designed to deliver efficient energy conversion, precise temperature management, and reliable long-term operation. The systems maintain battery cell temperature differences within 3°C and feature a three-level power conversion system (PCS) topology with conversion efficiency of up to 99%.
The storage systems also offer a cycle life exceeding 8,000 cycles, supporting long-term operational performance. The project will provide additional flexible regulation capacity to Northwest China’s renewable energy base and help improve renewable power consumption.
EAST has developed its own PCS, battery management system (BMS), energy management system (EMS), power management system (PMS), and battery PACK technologies. The project highlights the company’s capabilities in large-scale energy storage integration and deployment for China’s evolving power system.
Discover more from SolarQuarter
Subscribe to get the latest posts sent to your email.






