Central Electronics Limited (CEL) has invited Expression of Interest (EOI) for Empanelment of EPC Contractors for carrying out work of Ground Mounted Solar Power Generating System (SPGS) ranging from 2 MW to 10 MW for a cumulative capacity of 200 MW anywhere in India
Scope of work includes design, engineering, supply, construction, erection, testing, commissioning, etc.
The Last Date to submit the EOI is October 10, 2021, at 3 p.m.
Date and Time of opening EOI is October 10, 2021 at 3:30 p.m.
Security Deposit is of Rs. 3 Lakhs. The empanelment will be valid up to 1 year from the date of issue of empanelment letter.
The applicant’s company/firm must have designed, supplied, tested, installed and commissioned cumulative 5 MW grid-connected solar power plants either directly or indirectly for any government department or company in the last 5 years. Of this, the applicant must have carried out at least one single project of 1 MW of grid-connected solar power plant at a single location either directly or indirectly for any government department or company in the last 5 years.
The applicant must have had a minimum average turnover of Rs. 20 crores in the last three financial years (FY19, FY20 and FY21) from solar business. A certificate regarding total turnover and minimum turnover from solar business in the last three financial years (duly signed by a chartered accountant) supporting audited balance sheets must be submitted. In case audited balance sheet of FY 20-21 is not available, then the provisional balance sheet (duly signed by a chartered accountant) of FY 2020-21 may be submitted.