NewsMDL Invites Supplier for Maintenance Of 390 Kwp Rooftop Solar

MDL Invites Supplier for Maintenance Of 390 Kwp Rooftop Solar

Mazagon Dock Shipbuilders Limited (MDL) invites competitive bids from reputed suppliers for maintenance of 390 kwp solar power plant installed at various rooftop in MDL.

Growatt

Last date of bid submission is 24.08.2020 at  15:00 pm. Opening date & time of tender is 25.08.2020 at 15:30 pm

Scope of work for successful bidder includes regular and periodic checks of PV Modules, Power Conditioning unit(inverter) and other LT Panels, junction Boxes etc. and carry out periodical maintenance of PV Modules and all other equipment, Measuring of earthing resistance once in 6 months. 

To know about the tender refer to document below :

To participate in this bid bidder should be  System integrator cum EPC (Engineering, Procurement & Construction) Vendor and should carry out maintenance activities of solar plant. 

Bidders should also successfully maintain SPV power plants of minimum 2 numbers with cumulative capacity of the plants of minimum 200kWp in the last 5 years.

Also Read  KPI Green Energy Receives CEIG Approval for 100 MW Solar Project Executed for MAHAGENCO in Maharashtra

Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

RELATED ARTICLES

Subscribe Today

GET EXCLUSIVE FULL ACCESS TO PREMIUM CONTENT

SUPPORT CLEANTECH JOURNALISM

EXPERT ANALYSIS OF AND EMERGING TRENDS

TOPICAL VIDEO WEBINARS

Get unlimited access to our EXCLUSIVE Content and our archive of subscriber stories.

Exclusive content this week

UPCOMING EVENTS

Latest article

More articles

- Advertisement -Newspaper WordPress Theme