Waaree Forever Energies Private Limited, a wholly-owned subsidiary of Waaree Energies Limited, has signed a Power Purchase Agreement (PPA) with the Solar Energy Corporation of India Limited (SECI) for developing a large-scale solar power and energy storage project in Solapur, Maharashtra. The agreement marks an important step in the company’s efforts to expand its renewable energy portfolio and strengthen India’s clean energy infrastructure.
According to a regulatory filing submitted to BSE Limited and the National Stock Exchange of India Limited, the PPA was executed on November 20, 2026. The disclosure was made under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. The company stated that the agreement follows an earlier intimation issued on August 28, 2026.
The proposed project will combine 700 MW of solar power generation capacity with a 700 MW/2,800 MWh Energy Storage Solution (ESS). The integration of battery storage with solar generation is expected to support more reliable electricity supply by allowing energy generated during periods of strong sunlight to be stored and used when solar generation is unavailable or lower.
The project represents a significant addition to Maharashtra’s planned renewable energy capacity. Large-scale solar and storage projects are becoming increasingly important as India works to increase the share of renewable energy in its electricity mix while addressing the challenges associated with the intermittent nature of solar and wind power.
Battery energy storage systems can help balance electricity demand and supply, improve grid flexibility and support the integration of higher levels of renewable energy. With 2,800 MWh of storage capacity planned alongside the 700 MW solar project, the development will bring together renewable power generation and energy storage infrastructure at a utility scale.
Waaree Energies Limited is listed on BSE under Scrip Code 544277 and on NSE under the trading symbol WAAREEENER. The regulatory filing was signed by Rajesh Ghanshyam Gaur, Company Secretary and Compliance Officer.
The company has not disclosed further details regarding the project’s development schedule, commissioning timeline or tariff structure in the latest filing. The signing of the PPA nevertheless establishes a formal contractual step towards developing the proposed solar and energy storage project in Maharashtra.
Discover more from SolarQuarter
Subscribe to get the latest posts sent to your email.






