NewsNTPC Calls for Proposals for Rooftop Solar Projects Totaling 4.1 MW

NTPC Calls for Proposals for Rooftop Solar Projects Totaling 4.1 MW

In a recent development, NTPC has opened the bidding process for the construction of grid-connected rooftop solar power projects totaling 4,106 kW. These projects, earmarked for installation at five different locations falling under the Container Corporation of India’s (CONCOR) jurisdiction, present a comprehensive scope of work.

Growatt

Interested bidders must submit their proposals by January 16, 2024, with the bid opening scheduled for January 17.

The core activities encompass design, testing, and commissioning, with additional ancillary tasks such as rooftop strength testing, water arrangements, electricity provisions, security measures, and transportation logistics. An essential criterion for project implementation is the selection of locations with minimal shadows, ensuring optimal power generation efficiency on each building. The final project capacity will be determined based on detailed engineering and approved designs for the solar installations.

The selected bidder will not only be responsible for the aforementioned core and ancillary tasks but will also take on the operations and maintenance activities for a substantial 10-year duration.

NTPC plans to finance the project using either domestic or internal resources. As part of the bidding process, participants are required to furnish a bid security of ₹20 lakhs. Upon successful award notification, a performance bank guarantee equivalent to 10% of the contract price must be provided within 28 days.

Also Read  Malaysia Launches LSS6 With 2.5 GW Solar And 1.25 GW BESS Capacity

Participation in the bidding process is restricted to Class-I and Class-II local suppliers, with prerequisites such as a minimum local content of 50% for ‘Class-I’ and 20% for ‘Class-II.’ Financial criteria include an average annual turnover not falling below ₹20.1 crores over the last three financial years, coupled with a net worth of at least 100% of the paid-up share capital for consideration. On-site visits for essential details are mandatory before finalizing bids.


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

RELATED ARTICLES

Subscribe Today

GET EXCLUSIVE FULL ACCESS TO PREMIUM CONTENT

SUPPORT CLEANTECH JOURNALISM

EXPERT ANALYSIS OF AND EMERGING TRENDS

TOPICAL VIDEO WEBINARS

Get unlimited access to our EXCLUSIVE Content and our archive of subscriber stories.

Exclusive content this week

UPCOMING EVENTS

Latest article

More articles

- Advertisement -Newspaper WordPress Theme