Sineng
UPEX 2026

NTPC Green Energy Invites Bids Inverter Procurement For 140 MW Bilhaur Solar Project In Uttar Pradesh

0
1400
alternative energy building clouds energy
Representational image. Credit: Canva

NTPC Green Energy Limited, a wholly owned subsidiary of NTPC Limited, has invited online bids for the procurement of a 2500 KW TBEA make Central Inverter (Model No TC2500KF). This equipment is required for the 140 MW NGEL Bilhaur Solar Power Project. The bidding process will follow a Single Stage Composite Bidding format, which includes both Techno-Commercial and Price Bids to be submitted online.

The scope of the work specifically involves the procurement of the central inverter from eligible and qualified bidders. Interested bidders must ensure that they are registered on this platform to participate in the tendering process.

No tender fee or bid security (EMD) is required for this bid, making it accessible to a broader range of participants. However, the performance bank guarantee (PBG) requirement is not applicable either, indicating a procurement-focused tender rather than a full EPC (Engineering, Procurement, and Construction) scope.

The bid submission end date is 8th April 2025, tender dates for query clarification is 7th April 2025.

Also Read  Union Budget 2026โ€“27 Reinforces Indiaโ€™s Renewable Energy Push With Focus On Storage, Manufacturing, And Financing

Bidders from countries sharing land borders with India must be registered with the competent authority, as per Government of India guidelines. Also, only Class-I local suppliers, as defined under the Public Procurement (Preference to Make in India) Order 2017 and its amendments, are eligible to participate.

NTPC Green Energy Limited reserves the right to cancel or modify the tender at any point without assigning a reason. All interested parties must ensure they comply fully with the General Terms and Conditions, including fraud prevention and procurement restriction policies, or their bids will not be considered for evaluation.


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.