The Ministry of Railways, acting on behalf of the President of India, has issued an electronic tender (E-Tender) for the supply and installation of a 1.2 MWp Rooftop Solar PV System at various locations within Perambur, Southern Railway. This initiative aims to generate and supply energy to railway installations through the Renewable Energy Service Company (RESCO) mode.

growatt_inside_jan

Tender has set the closing date and time for bid submissions as November 6, 2023, at 15:00 hrs. Bidders are advised that manual offers will not be accepted, and any such submissions will be disregarded.

Antai

The project, is valued at ₹163,226,236.32 and falls under the category of a works contract expenditure. The bidding style is a single rate for each schedule item.

hoymiles

Key details of the project include:

Tender document cost: ₹34,810.00
Earnest money: ₹1,281,600.00
Validity of the offer: 180 days
Period of completion: 240 days
Bidding start date: October 23, 2023
Joint venture (JV) firms are allowed to bid.
Bids will be ranked from lowest to highest expenditure.

Also Read  KPI Green Energy Clinches 24.96 MW Of Solar Project Contracts In CPP Segment

The project involves the implementation of a Rooftop Solar PV System with a capacity of 1.2 MWp. The tariff rate shall exclude taxes and levies related to connectivity and operation of the solar plants after the Commercial Operation Date (COD), with these expenses being borne by Railways. Rates quoted should be on the basic tariff rate, and any statutory levies, charges, or taxes will be covered by Railways without recovery from the Solar Power Developer (SPD) on monthly bills.

A pre-bid conference is scheduled for October 12, 2023, at 15:00 hrs, providing interested parties an opportunity to seek clarification on the tender requirements and procedures.