UPEX 2026

CMPDI Announces Tender for 5 MW Solar Power Plant with 10 Years O&M Services in Maharashtra

0
1195
Representational image. Credit: Canva

The Central Mine Planning and Design Institute Ltd. (CMPDI), a subsidiary of Coal India Ltd. and a Miniratna Company, has announced an online tender for the design, engineering, procurement, supply, construction, erection, testing, and commissioning of a 5 MW (AC) solar power plant. This project, located in the Chandrapur area of Western Coalfields Limited (WCL) in Maharashtra, includes comprehensive operation and maintenance (O&M) for ten years.

Bids must be submitted by July 2, 2024, with the opening scheduled for July 3, 2024, at 11 AM.

The tender, accessible on the Central Public Procurement Portal (CPP) and Coal Indiaโ€™s e-tender website, invites eligible bidders possessing a valid Digital Signature Certificate (DSC). The estimated cost of the project is โ‚น25,21,25,870, inclusive of GST, with an earnest money deposit of โ‚น31,51,573 required. The total contract period spans 3922 days, with 270 days allocated for construction and commissioning, and 3652 days for O&M.

For further details view the tender document below:


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.