Solar Energy Corporation of India (SECI) issued Clarifications II for EOI Submission for Renewable Energy (RE) based Solutions/ System/ Technology at Himalayas, India.
This is in reference to the EOI No. SECI/SD/EOI/20-21 regarding the Expression of Interest for “Renewable Energy (RE) based Solutions/ System/ Technology for meeting energy requirements in remote areas (HAA) of Himalayas, India”.
The EOI document including its Annexures have been uploaded on CPPP Portal. Prospective bidders are requested to refer to CPPP and SECI websites for details.
An e-consultation meeting with all the prospective participants had held at SECI OFFICE on 05.10.2020 through Online Mode.
Last Date for Submission of Bids is hereby extended (Online Only – through email) : Upto 1800 HRS on 05.04.2021