waaree_jan
buybestinclassgoodwesolarinvertersandwinexcitingprizes

TCIL Floats Tender For 2 MW of Floating Solar Project at Tamarind Falls Reservoir, Mauritius

0
156
Madhya Pradesh to Set Up 3 New Floating Solar Plants with Investment of Rs 7,500 Cr

Reading Time: 2 minutes

growatt_inside_jan

Telecommunications Consultants India Ltd. (TCIL) has floated a tender for selection of partner for The Design, Supply, Installation, Testing and Commissioning of a 2 MWac Floating Solar Power Plant (FSP) at Tamarind Falls Reservoir (TFR), Republic of Mauritius.

pixon_feb

Telecommunications Consultants India Ltd. (TCIL) is a Govt. of India Enterprise, under Department of Telecommunications, Ministry of Communications. It was set up in 1978 to share Indian experience and expertise with developing countries and to assist bulk users of telecom services in setting up dedicated telecom networks.

powernsun

EOIs are invited from eligible bidders for Pre-Tender Tie-up with TCIL for The Design, Supply, Installation, Testing and Commissioning of a 2 MWac Floating Solar Power Plant (FSP) at Tamarind Falls Reservoir (TFR), Republic of Mauritius.

TCIL is having presence in Mauritius since 1991 and intends to participate in this tender as the lead bidder. This EOI is floated for selection of a partner ready to work with TCIL on exclusive basis for the above project. Bid needs to be submitted offline for this EOI. Prospective bidders need to submit their bids with the most
competitive Techno-commercial offer for the aforesaid work.

Also Read  The UAE Will Benefit From Its Global Leadership In The Clean And Renewable Energy Sector - MD & CEO of DEWA

Last date & time for submission of Bids is 21.12.2022 till 15:00 and the bids will be opened the same day at 15.30.

Bid shall remain valid for 210 days after the date of bid opening. The bid valid for a shorter period shall be rejected as non-responsive. In exceptional circumstances, TCIL may request the bidder for an extension to the period of bid validity if same is requested by the tendering authority and accordingly, the bid securing declaration shall also be suitably extended by the bidder.

For more details view the tender document here:

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.