
The Municipal Corporation of Greater Mumbai (MCGM) has recently floated a 100 MW tender to develop floating solar-hydropower hybrid power projects at the Middle Vaitarna Dam in the state.
It is highlighted that of the total 100 MW, 80 MW will be floating solar projects whereas 20 MW will be hydroelectric power projects.
The last date for the submission of bids is 10-12-2020.
The scope of work for this tender includes design, built, construction of 100 MW Hybrid Power Project Facility with O & M for 25 years .
To know more refer to the document below: