The Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) invites Online Bids (e-tenders) for selection of Solar Project Developers for setting up of total 275 MW capacity Grid connected SPV Power Projects in UP Solar Park located at Kanpur.
Date for Pre-bid Meeting: 17.2.20121 at 12.30 pm
Last Date of Submission of bid: 01.03.2021, upto 6.00 PM.
Technical e-bid Opening Date: 02-3-2021 at 12.30 PM
For more details view below document:
Uttar Pradesh Electricity Regulatory Commission (UPERC) had received a petition from Institution of Engineering and Technology against Uttar Pradesh New & Renewable Energy Development Agency. to allow the present petition and direct UPNEDA to issue approval for installing a directional meter on 1MW grid connected rooftop Solar Power Plant set up by (IET) .