si-neng

NTPC Renewable Energy Invites Bids for HT Power Cable Supply Package for 1,255 MW Solar Block in Gujarat’s Khavda RE Park

0
112
Representational image. Credit: Canva

NTPC Renewable Energy has issued an invitation for bids to supply HT power cables for a 1,255 MW solar block in Khavda Renewable Energy Park, located in Gujarat’s Kutch district.

growatt_inside_jan

The package entails manufacturing, testing, packing, and delivery of 33 kV grade power cables with specific requirements. The cables should have a stranded compact circular aluminum conductor and 90% armor coverage. Approximately 835 kilometers of cables are needed for the project.

The deadline for bid submission is June 29, 2023, and the bids will be opened on the same day. Interested parties are encouraged to participate in this opportunity to contribute to renewable energy infrastructure.

For more details view tender document:

hoymiles

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.