NTPC Renewable Energy has issued an invitation for bids to supply HT power cables for a 1,255 MW solar block in Khavda Renewable Energy Park, located in Gujarat’s Kutch district.
The package entails manufacturing, testing, packing, and delivery of 33 kV grade power cables with specific requirements. The cables should have a stranded compact circular aluminum conductor and 90% armor coverage. Approximately 835 kilometers of cables are needed for the project.
The deadline for bid submission is June 29, 2023, and the bids will be opened on the same day. Interested parties are encouraged to participate in this opportunity to contribute to renewable energy infrastructure.
For more details view tender document: