Sineng PV Inverter
Waaree Energies

AGEL Q1 Results: Reports Highest Revenue; Cash Profit at Rs.460 Cr

0
518
alternative alternative energy close up electricity
Photo by Pixabay on Pexels.com

Reading Time: 2 minutes

growatt01-08-2022

Adani Green Energy Ltd. a part of the Adani Group, announced the financial results for the quarter ended June 30, 2021. The Operational Performance Snapshot for the period is as follows:

pixon energy

Financial Performance – Q1 FY22:

ParticularsQuarterly performance
Q1 FY22Q1 FY22% Change
Total Income1,07987823%
Revenue from Power Supply84860939%
    
Total EBITDA 389268031%
EBITDA from Power Supply 478956041%
EBITDA from Power Supply (%)92.5%91.2% 
    
Cash Profit 546034235%
  • Robust growth in Revenue from Power Supply is backed by robust growth in capacities and improved Solar and Wind CUF.
  • Significant improvement in EBITDA from Power Supply and Cash Profit is supported by increase in revenues and cost-efficient O&M driven by thrust on data analytics.

“AGEL’s growth continues to accelerate,” said Mr. Gautam Adani, Chairman of the Adani Group.

Also Read  ReNew Power To Invest Rs 50,000 Cr in RE, Storage and Green Hydrogen Production in Karnataka

Operational Performance – Q1 FY22:

ParticularsQuarterly performance
Q1 FY22Q1 FY21% change
Sale of Energy (Mn units)2,0541,38548%
Solar1,6501,18639%
Wind404199103%
    
Solar portfolio CUF (%)25.0%24.8% 
Wind portfolio CUF (%)38.5%36.9% 
  • Sale of Energy increased by 48% YoY on the back of capacity addition of 1,075 MW and improved Solar and Wind CUF.
  • Solar CUF improved with 20 bps improvement in grid availability, consistently high plant availability of 99.6% and consistent solar irradiation.
  • Overall Wind portfolio CUF improved backed by higher efficiency of new wind plants with technologically advanced Wind Turbine Generators.

Updates – Q1 FY22:

  • Renewable projects of 200 MW commissioned in Q1 FY22 under existing portfolio
  • AGEL in the process of acquiring SB Energy’s 5 GW India renewable portfolio for a fully completed EV of USD 3.5 billion – India’s largest renewables M&A transaction
  • Post SB Energy’s acquisition, Operational Capacity to increase from 3.5 GW to 5.4GW 1 and total Locked-in Growth2 to increase from current 19.2 GW to 24.3 GW1
  • Solar portfolio CUF up by 20 bps YoY at 25% with 99.6% plant availability
  • Wind portfolio CUF up by 160 bps YoY at 38.5% with 94.6% plant availability
  • Total Income up by 23% YoY at Rs. 1,079 cr
  • Total EBITDA3 up by 31% YoY at Rs. 892 cr
  • EBITDA from Power Supply4 up by 41% YoY at Rs. 789 cr
  • EBITDA margin from Power Supply improves by 120 bps YoY at 92.5%
Also Read  Juwi Shizen Energy Connects 54 MW Solar Park To The Grid in Japan

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.